Step 1
Carpet shield is put down over all carpet to keep client site clean.
-
Step 2
The floor is cleaned and prepared for self leveling sub floor
-
Step 3
Barriers are put into place to fence self leveling pour
-
Step 4
All cracks and under wall plates are seated to prevent leakage
-
Step 5
Plastic lath is installed on subfloor
-
Step 6
The infloor heating system is installed by electrician
-
Step 7
Mixing self leveling sub floor, Poor takes over night to dry
-
-
Step 9
Start of Shower Pan build form
-
-
Step 11
Install Pan Liner
-
Step 12
Notice pan liner goes up the studs 6 inches
-
Step 13
Notice slope of pre-pan
-
-
Step 15
Add 2nd layer of mud on top of pan liner and slope to drain
-
Step 16
Notice slight slope
-
Step 17
Build Curb form and put into place
-
Step 18
Notice liner coming up between forms
-
Step 19
Fill in curb form
-
Step 20
Remove curb form boads and tape all corners and seams using fiberglass mess tape
-
Step 21
Add anti-crack and waterproofing membrane to all corners, walls and curbs
-
Step 22
Figure out height and location of shower niche and build
-
Step 23
Install level boards for wall tiles install 1st couple of rows of wall tile , next
install showerpan tiles
-
Step 24
Figure out layout of floor tiles for the whole room
-
Step 25
start to lay in floor tile
-
Step 26
Finish setting floor tiles
-
Step 27
Tile sides of curb
-
Step 28
Make sure that cap of curb has a slight tilt for water run off
-
Step 29
Finish tiling the top of curb and installing bottom row of wall tiles
-
Step 30
Finish tiling shower walls and niche leaving space for decortive tile
-
Step 31
Tiled walls to cieling with nice clean cut along cieling line
-
Step 32
Install shelf in niche
-
Step 33
Making sure top and bottom shelves are slitie tiling towards shower so water run
off
-
Step 34
Install decortive tile in opening left for decortive tile
-
Step 35
Grout shower walls and Floor using unsanded sandstone baige grout
-